ARROWHEAD 2026 ROAD IMPROVEMENTS
Project Description
The work to be performed generally includes: approximately; 47,600 square feet of asphalt milling, 1,680 tons of asphalt (PG 58-34), 72 lineal feet of crack repair with milling, 238 lineal feet of Petrotac fabric after milling, 28 adjustments of manhole or gate valves, 634 lineal feet of curb and gutter, 423 lineal feet of concrete pan, pavement striping. Documents available by owner . due 3/13/2026



