Aspen Lead Service Line Inventory Potholing
Project Description
Add 3 Answer to Question #2 Available by owner
Addendum 2 The addendum incorporates: • Clarifications discussed at the pre-bid meeting, • Internal edits to the technical specifications and authority language, and • Revisions to Section 2.0 (Contract Time) to align with the updated procurement schedule. Documents available by owner.
Addendum 1Answer to Question #1 available by owner
2026-059 The goal of this project is to physically verify the material of twelve (12) water service lines within the City of Aspen by performing hydrovac potholing at each designated location. Documents available by owner. Bid Due Date: 3/11/2026