Breckenridge Sawmill Pedestrian Connection
Project Description
Add 1 The following additions and/or changes to the Contract Documents and construction plans for the Breck Pathways: Sawmill Pedestrian Connection project shall be made: NEW DOCUMENTS ADDED TO THE CONTRACT: Add the following documents to the contract (see Addendum #1 documents on BidNet): Addendum 1 Summary_Sawmill Ped Connection (this document) 08_ Responses to Questions Replace the following documents to the contract (see Addendum #1 documents on BidNet): 01_Sawmill_2026_Bid Form and Contract. Documents available by owne
17-06-102-006 Construction of the plan set provided by Norris Design for the Sawmill Pedestrian Connection. The project site is within the Town of Breckenridge starting at th bridge crossing the Blue River from the South Gondola Parking Garage, through the Sawmill Parking Lot and Wellington Parking lot, terminating at Main Street. Documents available by owner. Bid Due Date: 5/21/2026