Cortez Airport Leach Field Replacement Project
Project Description
Add 1 Q&A
GS-26-ALF The project consists of installing a new leach field, replacing the existing leach field that serves the Cortez Municipal Airport’s onsite wastewater system. The current leach field has experienced partial-to-complete functional failure due to age and diminished percolation capacity. Work will include all necessary excavation, installation of a new leach field system sized and designed in accordance with current regulatory requirements, and all associated site restoration and protection of facilities. Work will also include the removal and replacement of one (1) septic tank with a pre-cast concrete tank measuring 1,000-gallons in capacity. due 6/15/2026
Pre Bid Information
Project Details
Project Contact Information
Additional Project Contact Information
Project Documents
-
Document Title: rfq
Document Type: spec
RFQ GS-26-ALF - City of Cortez Airport Leach Field (application/pdf) (Download File)