Crested Butte Lake Grant Dam Spillway Repair Project
Project Description
Lake Grant Dam Spillway Repair Project: Installation of a 44-foot compacted clay cutoff wall, removal and replacement of riprap to facilitate installation of the cutoff wall, and modifications to the existing spillway crest wall notch and outlet structure sill.
Obtaining the Bidding Documents
Information and Bidding Documents for the Project can be found at the following designated website:
https://applegategroup.sharefile.com/d-sfdb82c8d32dc49e38b4271adbda3f926
Pre Bid Information
Project Details
Project Contact Information
Additional Project Contact Information
Project Documents
-
Document Title: RFP
Document Type: spec
Lake Grant Dam Spillway Repair Project - C-111 Bid Advertisement 9Mar2026 (application/pdf) (Download File)



