Dillon EV Parking Lot Construction
Project Description
Add 1 Corrected the quantities for BID items 23, 24 and 25.Added Bid Item 29 to install 8 bollards, 2 each at each of the 4 EV charging stations to protect them from damage.
2026.EV installation of small parking lot; the Work shall include but not be limited to the installation of concrete valley pans, concrete sidewalks, asphalt paving, colored concrete slope paving, storm sewer inlet installation, Storm trench drain, associated removal and replacement of concrete and asphalt within Little Dam Street, minor grading to the subgrade and haul off of excess materials. due 7/10/2026 *Documents available by Owner