Duchesne Office Mechanical room Renovation
Project Description
Modification: change due date to 6/15/20265
1240LT26Q0080 Work includes the repair of the damaged floor and subfloor and the installation of new laminate flooring, the installation and plumbing of a new mop sink and replumbing the existing water heater TPR valve water line and the furnace condensate water line to the existing grey water drain line within the crawl space. Due 060/09/2026 CLICK HERE



