Eagle Waterless Restroom and Fountain
Project Description
Add 1 Q&A
OS-IFB-26-1 seeking bids from qualified contractors to furnish and install a precast concrete double-vault waterless restroom and outdoor drinking fountain at the Haymaker Trailhead. The project includes removal of the existing metal portable restroom enclosure, utility connection for the drinking fountain, approximately 200 linear feet of new water service line, concrete flatwork and ADA access improvements, gravel infiltration pit drainage, vault excavation and installation, site grading, restoration, and related construction services due 7/10/2026 *Documents available by Owner



