Gypsum Highway 6 Segment 1
Project Description
Add 1 – Adding the Geotech Report, Survey files and Pre-SOQ sign in sheet. Also a few Q&A.
ID#25-10 – The work includes visualizations, preliminary and final design, railroad coordination, supplemental topographic survey as needed, hydraulics design, floodplain revisions, Subsurface Utility Engineering (SUE) investigation, utility relocation coordination, Gypsum Creek realignment, sanitary sewer design, National Environmental Policy Act (NEPA) work, pavement design, roundabout design, bike path design, and signing and striping for 2 through lanes in each direction of US 6 for the project limits. Bids Due 2/10/2026
*Documents available by owner