HMD6 RMF 4A and 5 Site Infrastructure
Project Description
Haymeadow Metropolitan District #6 RMF 4A and 5 Site Infrastructure The work to be performed generally includes two phases:
Phase 1 –Approximately 1,629 LF of asphalt roadway, 2,348 LF of concrete curb and gutter, 4,741 SF of concrete sidewalk, 8,154 SF of asphalt parking lot. Also includes approximately 1,192 LF of storm piping and associated inlets and manholes, 1,806 LF of 8” DIP, 35 LF of 6” DIP, 2,254 LF of 1” copper with fire hydrants, fittings and gate valves. Also includes approximately 1,452 LF of 8” PVC sewer main, 14 manholes, 4 non-potable irrigation meters and 4,664 LF of shallow utilities.
Phase 2 – Approximately 986 LF of asphalt roadway, 1,880 LF of concrete curb and gutter, 13,376 SF of concrete sidewalk, 14,535 SF of asphalt parking lot. Also includes approximately 745 LF of storm piping and associated inlets and manholes, 825 LF of 8” DIP, 10 LF of 6” DIP, 3,267 LF of 1” copper with fire hydrants, fittings and gate valves. Also includes approximately 1,371 LF of 8” PVC sewer main, 19 manholes, 3 non-potable irrigation meters and 9,224 LF of shallow utilities. due 2/26/2026 Documents for use in preparing Bids may be obtained after Tuesday, January 13, 2026 .