Mt Crested Butte Babbling Brook Ditch Improv
Project Description
The Town of Mt. Crested Butte is requesting sealed bid proposals from qualified construction firms for the Gothic Rec Path & Babbling Brook Ditch Improvements in Mt. Crested Butte. This Project involves Rec Path and Drainage improvements for nearly 235 linear feet along the west side of Gothic Road, between Snowmass Road and the Snowcrest Pedestrian Bridge. The Project entails the removal of the concrete Rec Path and two wood deck pedestrian bridges, installation of storm drain piping systems, earthwork, grading, shouldering, curbing, and reconstruction of the 10-foot wide concrete Rec Path along a similar alignment. Bids Due 2/26/2026
“Interested contractors can visit the site at any time, and can arrange a project site tour with Town staff coordinated with Jeff Smith”
Pre Bid Information
Project Details
Project Contact Information
Additional Project Contact Information
Project Documents
-
Document Title: RFP
Document Type: spec
MTCB - Babbling Brook - SGM Project Manual (01-30-2026 FINAL ADA POST) (application/pdf) (Download File)
-
Document Title: Drawings
Document Type: spec
MTCB - Babbling Brook - SGM Design Drawing Set (01-26-2026 FINAL ADA POST) (application/pdf) (Download File)



