NTUA Fiber Optic Construction
Project Description
Add 1 – Wage Rates added
NTUA hereby contacts qualified contractors to install/construct fiber optic lines at various locations across the Navajo Nation. This scope of work will include
Fiber to the Home (FTTH~500 homes); ERATE projects (200 miles); and Miscellaneous projects (~ 50 miles). All materials to be provided by NTUA. due 3/17/2026
Pre Bid Information
Project Details
Project Contact Information
Additional Project Contact Information
Project Documents
-
Document Title: waibver
Document Type: spec
NTUA Debarment and Suspension Waiver_2025 (application/pdf) (Download File)
-
Document Title: rfp
Document Type: spec
RFP – 2026 Fiber Optic Construction_FINAL (application/pdf) (Download File)
-
Document Title: Wage rates
Document Type: addendum
Addendum 1_2026 Fiber Optic Construction_ONLR Wage Rates (application/pdf) (Download File)
-
Document Title: Q&A
Document Type: addendum
Addendum 1_2026 Fiber Optic Construction (application/pdf) (Download File)



