Paonia Raw Water Monitoring
Project Description
Addenda 1 Please see attached meeting minutes and attendance sheet from the pre-bid meeting held on May 14 at 3 pm..Please see attached meeting minutes and attendance sheet from the pre-bid meeting held on May 14 at 3 pm.
2026-02 Work to be performed generally includes four new remote metering sites for the Town of Paonia’s source water system. Remote monitoring capabilities will be provided at the following sites: German Creek Springs / Lakefork Spring 80:20 box, water treatment plant pressure break box, Old Original Spring / Reynolds Spring confluence pipe, and Lakefork spring (as a bid add alternate). The new meters will measure flow and temperature, and will generally include provision of the following: new endpoint devices, solar panel, data logging collection, new monitoring devices, bypass piping, manhole housings (as required), and remote telemetry service. Documents available by owner due 6/3/2026