Pitkin Co CMGC Housing Improvements
Project Description
Add 1 RFQ/P Clarification Response
ASD-004 Aspen School District is seeking a Candidate to facilitate the construction of site grading, site utilities (including retrofitting existing wellwater system and tying new well-water system into existing), fire suppression infrastructure for the apartments as required by the local fire department (design by others), site-built structures (water pump house, carports), flat work, storm infrastructure, coordination of potential geothermal and photovoltaic systems, foundations for the prefabricated modular units, and final connections of site utilities to the prefabricated units. due 7/8/2026 *Documents available by Owner



