Salida South Ark Phase 1 Residential Development
Project Description
Add 2 SUBMISSION PROCESS CORRECTION: Each section of the bid must to be submitted separately, rather than as a single PDF.
Add 1 Q&A, Increases to lot sizes (smaller green courts) for Lots 27 to 49; Removal of an easement within Lot 6 to increase buildable area; Reconfiguration of Lot 9 to benefit access to Lot 7; Removal of Tract adjacent to Lot 24 (and subsequent increase to the size of that lot); and Updated Tract names/letters.
2026-006 The South Ark Neighborhood; Phase I of the project includes approximately 53 development lots capable of supporting up to roughly 150 residential units, along with supporting infrastructure and neighborhood amenities. due 7/10/2026 *Documents available by Owner



