Summit Co Quandary Peak Trailhead Redesign
Project Description
Add 4 Lot surveys
Add 3 Double Vault Toilet Drawing
Add 2 Pre Bid meeting attendance sheet
Add 1 Q&A
Summit Co furnish all labor, transportation, and incidentals necessary to perform site assessments and the preliminary and final designs for the Quandary Peak Trailhead, as outlined in “Exhibit A: Scope of Work.” Work shall be completed as set forth in a contract for this project to be negotiated with the County and Town and based upon the contractor’s written proposal as outlined in “Exhibit C: Bid Directions.” due 7/14/2026
Pre Bid Information
Project Details
Project Contact Information
Additional Project Contact Information
Project Documents
-
Document Title: RFP
Document Type: spec
1. RFP- Quandary Peak Trailhead Redesign (application/pdf) (Download File)
-
Document Title: Scope of Work
Document Type: spec
2. Exhibit A- Scope of Work (application/pdf) (Download File)
-
Document Title: Maps
Document Type: spec
3. Exhibit B- Maps (application/pdf) (Download File)
-
Document Title: Bid Instructions
Document Type: spec
4. Exhibit C- Bid Instructions (application/pdf) (Download File)
-
Document Title: Q&A
Document Type: addendum
5. Exhibit D - Q and A (application/pdf) (Download File)
-
Document Title: Pre-Bid Meeting Attendance Sheet
Document Type: addendum
6. Exhibit E- Pre-Bid Meeting Attendance Sheet (application/pdf) (Download File)
-
Document Title: Double Vault Toilet Drawing
Document Type: addendum
7. Exhibit F - CXT Tioga Double Vault Toilet Drawing (application/pdf) (Download File)
-
Document Title: Lot Surveys
Document Type: addendum
8. Exhibit G - Lot Surveys (application/pdf) (Download File)