Telluride Stillwell Fill and Drain Line

Project Description

Add 1: Prebid Meeting Notes and Agenda; WL Plastics’ Field Procedures and Pipe Specs; Updates to Front End Docs – see red clouded portions; BEI prepared Erosion Control Plan Sheets; BEI prepared Final Design for Retaining Wall; Bid Form in excel format; Exceptions to the bid added to the bid form available by owner.

2026-3            The existing high pressure 10-inch spiral wound steel fill line for the Stillwell water storage tanks has reached the end of its useful life. Since this line is to be replaced, Public Works will also replace the 4-inch HDPE slipped inside a 6-inch cast iron drain line for the Stillwell water storage tanks.               Documents available by owner.                Bid due Date: 3/20/2026

Pre Bid Information

Pre Bid Meeting? Yes
Pre Bid Required: No
Pre Bid Due Date /Time: February 25, 2026 2:00 pm
Pre Bid Meeting Location: virtual
Pre Bid Meeting Address: email togren@telluride.gov for a virtual meeting invite (platform: Teams).

Project Details

Bid Due Date: March 20, 2026 4:00 pm
Project Category: Update
Availability: Documents Available By Owner
Project Stage: bidding
Project State: Colorado
Project County: San Miguel County

Project Contact Information

Company Name: Town of Telluride
Contact First Name: Tara
Middle Name:
Last Name: Ogren
Contact Type: Owner
Email: togren@telluride.gov
Phone: 970-729-3127