Vernal Sewer Reconstruction
Project Description
Add 1: Clarifications, questions and answers
Pre-bid meeting minutes and sign in sheet now available
Communication 1 – Project manual and plans added
ID#GJ26-85 – Replacement of approximately 6500 ft of existing waterline with new 10-inch PVC line and approximately 6765 ft of sewer line with new 10-inch PVC line. 5800 FT of sewer line replacement will require bypass pumping. The project also includes the replacement of existing fire hydrants, water service meters, and a 2” mill and fill along approximately 1.5 miles of roadway. Bids Due 2/17/2026
Pre Bid Information
Project Details
Project Contact Information
Additional Project Contact Information
Project Documents
-
Document Title: RFP
Document Type: spec
Add for Bid 8.5X11 (application/pdf) (Download File)
-
Document Title: Plans
Document Type: spec
Plans - Vernal City (application/pdf) (Download File)
-
Document Title: Manual
Document Type: spec
Manual - Vernal City (application/pdf) (Download File)
-
Document Title: Prebid Minutes
Document Type: spec
Pre-bid Mtg Agenda Minutes (application/pdf) (Download File)
-
Document Title: Prebid Attendance
Document Type: spec
Pre-bid Attendance (1) (application/pdf) (Download File)
-
Document Title: Add 1
Document Type: addendum
Addendum No 1 S (application/pdf) (Download File)



